Recently Metlockast ltd has completed an overhauling and crankshaft replacement of Vessel’s 3 diesel generator MAN L16/24. Engine block lifted, pockets main bearing measurements and laser alignment carried out.
Work completed in 15 days from qualified technicians with successful results.
Engines tested by class surveyor and maker’s service engineer.